Electrofusion
Water Main Install

Polyweld NZ was selected as the preferred HDPE welding contractor for a major pipeline installation, involving a live tap connection which was completed safely, efficiently, and fully compliant with AS/NZS 4129:2020.

The innovative approach delivered substantial benefits for the client and community:

  • 20km of 355 SDR13.6 PN12.5
  • 7.5km of 125 SDR13.6 PN12.5 & 125 SDR9 PN20

In addition to welding services, Polyweld NZ also supplied critical fittings, including full-face flanges, equal tees, stub flanges, backing rings, and saddles. The project was designed by Beca and was our client’s largest pipeline project to date.

 
  • Successful 355 live tap
    First for Polyweld NZ, completed with precision and confidence.

  • Environmental protection
    Minimal excavation and reduced risk of wastewater discharge.

  • Significant Savings
    Time and cost savings by avoiding a full pipeline shutdown.

Image Gallery
Contact Us
Try Tooling
with Plasson Training