HOT TAPPING
WATER MAIN RENEWAL

The project scope of works was to install a new section of a water main underneath a railway line. To ensure continued supply of water while the existing main line was replaced, a temporary 250mm PE bypass to the existing main was required. Using Plasson Large Bore Saddle and hot tapping tool, the hot tap was performed by safely cutting into the existing 500mm PN16 PE pipe that was in use and under pressure. The newly installed pipe system is fully functional and will be reliable for the future.

“This wasn’t an easy task considering the difficult site conditions. Plasson was able to present a reliable solution that gave us the confidence to perform a live tap that works. On top of it, we highly valued the ease of installation of products as well as the time-saving and cost-effective element that comes with it.”

Damien Heffernan, Project Engineer, KenKar Plastics

  • Bypass Line
    A live tap install of a Plasson large bore electrofusion saddle allowed connection of a temporary bypass line.

  • Difficult Conditions
    The pipeline passed was underneath a railway line making the installation extra challenging with restricted access to the saddle installation site.

  • Complete Solution
    Plasson was the only supplier offering a saddle, hot tapping tool and profile clamping tool to allow the main to keep running, and the water supply to the town uninterupted.